7
4.5 CLEARANCES
A: 75 mm
B: 10 mm
C: 200 mm
The clearances around the boiler as shown above must be observed for correct operation.
A minimum of 200mm clearance must be maintained underneath the boiler to allow replacement of the heating elements if
required. A minimum of 500 mm clearance must be maintained in front of the boiler to enable easy access for servicing.
Ensure sufficient space to make all water connections including the outlet pipes for the heating and hot water safety valves
which should be routed to a suitable discharge point.
4.6 MOUNTING BRACKET
Mark the hole positions using the wall bracket as a template per the diagram.
Fit bracket securely onto wall before lifting appliance into position. Drill the holes and fit the bracket ensuring it is level using
suitable high strength screws, with appropriate plugs or fixings, minimum M10 size.
HANDLING BEFORE INSTALLATION
The Gabarrón Mattira Boiler must be handled with care and
stored the correct way up in a dry place. Any manual
handling/lifting operations will need to comply with the
requirements of the Manual Handling Operations Regulations
issued by the H.S.E.
The appliance can be moved using a sack truck on the rear face
although care should be taken and the route should be even. In
apartment buildings containing a number of storeys we would
recommend that the appliances are moved vertically in a
mechanical lift. If it is proposed to use a crane, expert advice
should be obtained regarding the need for slings, lifting beams etc.
Always use assistance if required. Wear suitable cut resistant gloves when handling the appliance.
Ensure safe lifting techniques are used. Do not lift the appliance by attached pipe-work or components.
When lifting the boiler ensure that the fixing elements and the wall have a sufficient load-bearing capacity. Check the quality