41
16.3 ELECTRICAL INSTALLATION
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heating system as a
means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference.
Fa
ilure to install and commission this equipment to the manufacturer’s instructions m
ay invalidate the warranty but does not
affect statutory rights.
Commissioned by (PRINT NAME)
Registered Operative ID Number
Company name:
Telephone number:
Company address:
Commissioning date:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Building Regulations Notification Number (if applicable)
ALL INSTALLATIONS
Is the electrical supply to the property
single?
three phase?
What is the rating of the main fuse to the property?
Amps
Is the circuit relating to the boiler power supply a dedicated circuit that only supplies the boiler?
Yes
Is the boiler circuit protected by an RCD?
Yes
What is the rating of the boiler circuit MCB?
Amps
What size Twin & Earth cable has been used for the boiler circuit?
mm
2
Has a “local” isolation switch been installed in close
proximity to the boiler?
Yes
What is the rating of the local isolation switch for the boiler circuit?
Amps
If external controls have been installed, are these powered from a separate switched and fused spur?
Yes
Have all electrical connections been checked for tightness including factory connections to main terminals and contactor?
Yes
Has the power setting on the boiler been adjusted to suit the installation requirements and within the capability of the power supply?
Yes
What kW power rating has the boiler been set to?
kW
Has a clamp meter test been carried out to verify the power rating?
Yes
No
Has the electrical installation been tested and certified?
Yes
The system has been installed and commissioned in accordance with the
manufacturer’s instructions
Yes
The system controls have been demonstrated to and understood by the customer
Yes
The manufacturer’s literature, including Installation Checklist and Service Record, has been explained and left with the
customer
Yes
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory
demonstration and receipt of manufacturer’s literature)
*All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a competent persons Scheme.
A Building Regulations Compliance Certificate will then be issued to the customer.