Start a Job
Note: This system is operated by either pressing and holding or quick pressing the
5
or
6
or reset or power
buttons.
Page 5
1. Turn On the system using the power button.
2. Turn on the oil valve using the control valve switch ( mounted in cab from the FieldMate wiring loom).
3. At power up one of the following screens are displayed. One screen is a HOLD screen, the other screen
is a RUN spreading.
4. Clear any information from a previous job by holding the REST switch
for 5 seconds. Only job spreading information is reset, all other user
setting are unaffected.