25
B1
!
English
Re-assemble split rail
During the next steps these components should not move away from each other.
1. Remove transit packaging.
2. Connecting bridge pre-mounted with screws
in one rail-end.
Do not over tighten the grub screws
as this will deform the rail.
3. Connect to the other rail.
Do not over tighten the grub screws
as this will deform the rail.
4. Connect the pilot-elements with the
U-shaped bridge.
5. Place the overlap carrier.
6. To test the rail, first slide the pilot runner along the entire rail before placing the
motor-unit.
7. Install and commission rail.
(chapter 2-4)
Содержание 6200 Series
Страница 2: ...Wijzigingen voorbehouden Changes reserved nderungen R serve de changement...
Страница 12: ...8 Nederlands...
Страница 16: ...12 Nederlands...
Страница 20: ...16 Nederlands...
Страница 22: ...18 Nederlands...
Страница 36: ......
Страница 46: ...8 English...
Страница 50: ...12 English...
Страница 54: ...16 English...
Страница 56: ...18 English...
Страница 70: ......
Страница 80: ...8 Deutsch...
Страница 84: ...12 Deutsch...
Страница 88: ...16 Deutsch...
Страница 90: ...18 Deutsch...
Страница 104: ......
Страница 106: ...Wijzigingen voorbehouden Changes reserved nderungen R serve de changement...
Страница 116: ...8 Fran ais...
Страница 120: ...12 Fran ais...
Страница 124: ...16 Fran ais...
Страница 126: ...18 Fran ais...
Страница 140: ...6200 GH00 Printed in the Netherlands 11 2010 Goelst Nederland B V www goelst com English Nederlands Deutsch Fran ais...