34
LI
N
E
L
O
A
D
DO NOT forget to cover it
4.2.7. Wiring
1) Connect LAN cable for MONI-CON and SPU
2) Wire the power filter
Warning
:
Electric Shock Hazard
Unplug the power of the WR2120-SPU
before servicing.
(1) Fix / Connect AC power cable (3cores)
(2) Confirm wiring on the circuit diagram of
power filter label before connecting.
(3) Connect the LINE side to match the line
color of LOAD side.
3) Insert cables into the protective tubes.
Protective Tube A1:
- AC Power cable
- LAN cable
- Control (HDR) cable x2
Protective Tube A2:
- Signal cable (Coaxial x3/set)
(*1) Attach cables tightly using cable ties
while leaving extra cable length for
strain relief at all connections.
(1) HDR cable: 26 pin
(2) LAN cable: MONI-CON
(3) Coaxial cable: Rx_IF_H
(4) Coaxial cable: Rx_IF_V
(5) Coaxial cable: Tx_IF
(6) HDR cable: 14 pin
(7) Terminal of shield mesh of coaxial cable:
ATU (fixed by M4 screw nereby
MONI-CON unit)
Type
Color
L
Live
Black
N
Neutral
White
E
Ground
Green
MONI-CON LAN connector
(1)
(6)
(3)
(4)
(5)
(2) (7)
Fix cables using cable ties
(*1)
. Fix signal (Coaxial) cable
Fix AC power cable
Fix control (HDR) & LAN cables
A1 A2
Figure 4.23: Power filter
Содержание WR2120
Страница 1: ...INSTALLATION MANUAL WEATHER RADAR MODEL WR2120 www furuno com...
Страница 52: ...46 6 OUTLINE DRAWING 1 Antenna Unit...
Страница 53: ...47 2 Signal Processing Unit...
Страница 54: ...48 3 Data Processing Unit...
Страница 55: ...49 4 Data Processing Unit Power Supply...