1-3
1.2
Mounting the Channel Base and Rack Console
Leave at least 100 mm of service space on the sides and at the rear of the console. Determine
cable coming position and size and ground location by referring to the figure below. Determine
size of the cable coming considering both cable size and cable bends.
Weld all sides of the channel base to the deck. Fasten the rack console to the channel base with
six M12 bolts.
After leading in cables through the rear of the rack console, cover cable entrances with putty or
silicone sealant to close any gaps.
Note:
After removing four hoisting eyebolts from the rack console, cover the four holes for the eye-
bolts with the cosmetic caps (installation materials: CP05-09301).
CAUTION
Ground the equipment to
prevent electrical shock and
mutual interference.
Handle copper plate carefully.
An edge of it may harm your
hand.
Service Space
100 mm
Service Space
Service Space
100 mm
Hex Bolt
Note:
Cable entrance at bottom of console. Determine
the cable coming location considering frame position,
cable layout and total sectional area of cabling.
Note:
After welding and painting
with rust inhibiting paint, paint
same color as console
(Munsell 7.5BG7/2).
Rear cable entrance
67x200 mm, 2 places
If necessary cables can
be led in through the
rear of the channel
base.
Cable Entrance 465x422 mm
Copper Plate Support
Steel plate with
copper plate 0.4x50x600 mm
Fixing Hole
RC-1800F2
Remove eyebolts and
cover with four cosmetic caps.
(Installation Materials: CP05-09301)
100 mm
(
φ
15, 6 places)
(M12, 6 pcs., local supply)
Содержание RC-1800F2 Series
Страница 20: ...1 10 This page is intentionally left blank...
Страница 36: ...3 6 This page is intentionally left blank...
Страница 44: ...10 Jun 08 R Esumi D 1...
Страница 45: ...July 14 03 D 2...
Страница 46: ...Dec 20 02 D 3...
Страница 47: ...Apr 17 07 R Esumi D 4...
Страница 48: ...D 5...