1. HOW TO INSTALL THE SYSTEM
1-8
Bulkhead installation
1. Mark locations for four self-tapping screws on the installation location.
2. Insert two self-tapping screws (6
30, supplied) at the top two screw holes, leaving
approx. 5 mm of the screws exposed.
3. Hang the processor unit on the two screws inserted at step 2.
4. Insert two self-tapping screws at the bottom of the unit.
5. Tighten all screws.
Note:
The processor unit must be installed on the bulkhead with the following direc-
tion.
Self-tapping screw
(6x30, 4 pcs.)
UP
OK
NG
Содержание FSV-85
Страница 28: ...1 HOW TO INSTALL THE SYSTEM 1 20 This page is intentionally left blank ...
Страница 56: ...3 ADJUSTMENTS AND CHECKS 3 10 This page is intentionally left blank ...
Страница 67: ...12 Nov 2010 Y NISHIYAMA D 1 ...
Страница 68: ...4 Feb 2011 Y NISHIYAMA D 2 ...
Страница 69: ...5 Nov 2010 Y NISHIYAMA D 3 ...
Страница 70: ...4 Apr 2014 H MAKI D 4 ...
Страница 71: ...6 Jul 2012 Y NISHIYAMA D 5 ...
Страница 72: ...Nov 22 06 T Matsuguchi D 6 ...
Страница 73: ...22 Apr 2013 Y NISHIYAMA D 7 ...
Страница 74: ...22 Apr 2013 Y NISHIYAMA D 8 ...
Страница 75: ...26 Nov 2010 Y NISHIYAMA D 9 ...
Страница 76: ...27 Dec 2010 Y NISHIYAMA D 10 ...
Страница 77: ...Nov 22 06T Matsuguchi D 11 ...
Страница 78: ...D 12 ...
Страница 79: ...29 Mar 2011 Y NISHIYAMA D 13 ...
Страница 80: ...13 Sep 2011 Y NISHIYAMA D 14 ...
Страница 81: ...13 Sep 2011 Y NISHIYAMA D 15 ...
Страница 82: ...Mar 14 07 R Esumi D 16 ...