1. HOW TO INSTALL THE SYSTEM
1-5
How to install the stays (anti-vibration measure)
Install stays from the top of the hull unit to the ship's hull. The stays should be angle
iron with a size of 75
75
9 mm or more and at least two pieces should be used; one
each to ship's bow and stern directions.
This measure must be done to prevent
damage to the transducer
.
Do not install the stays on a crossbeam on the overhead. Vibration-resistance effect
is reduced since vibration is applied to the stays as rotation force. Install them horizon-
tally.
Nut
Spring washer
Flat washer
Bow mark
HULL UNIT FLANGE
O-ring
TANK FLANGE
Flat washer
Hex bolt
Spring
washer
Nut
Flat washer
O-ring
RETRACTION
TANK
Hex bolt
(16 places)
Содержание FSV-85
Страница 28: ...1 HOW TO INSTALL THE SYSTEM 1 20 This page is intentionally left blank ...
Страница 56: ...3 ADJUSTMENTS AND CHECKS 3 10 This page is intentionally left blank ...
Страница 67: ...12 Nov 2010 Y NISHIYAMA D 1 ...
Страница 68: ...4 Feb 2011 Y NISHIYAMA D 2 ...
Страница 69: ...5 Nov 2010 Y NISHIYAMA D 3 ...
Страница 70: ...4 Apr 2014 H MAKI D 4 ...
Страница 71: ...6 Jul 2012 Y NISHIYAMA D 5 ...
Страница 72: ...Nov 22 06 T Matsuguchi D 6 ...
Страница 73: ...22 Apr 2013 Y NISHIYAMA D 7 ...
Страница 74: ...22 Apr 2013 Y NISHIYAMA D 8 ...
Страница 75: ...26 Nov 2010 Y NISHIYAMA D 9 ...
Страница 76: ...27 Dec 2010 Y NISHIYAMA D 10 ...
Страница 77: ...Nov 22 06T Matsuguchi D 11 ...
Страница 78: ...D 12 ...
Страница 79: ...29 Mar 2011 Y NISHIYAMA D 13 ...
Страница 80: ...13 Sep 2011 Y NISHIYAMA D 14 ...
Страница 81: ...13 Sep 2011 Y NISHIYAMA D 15 ...
Страница 82: ...Mar 14 07 R Esumi D 16 ...