www.furuno.com
All brand and product names are trademarks, registered trademarks or service marks of their respective holders.
Installation Manual
HALF-CIRCLE COLOR SCANNING SONAR
Model
FSV-75/FSV-75-3D
SAFETY INSTRUCTIONS ........................i
SYSTEM CONFIGURATION ..................iii
EQUIPMENT LISTS.................................v
1. MOUNTING......................................1-1
1.1 Required Tools and Materials .............1-1
1.2 Hull Unit ..............................................1-2
1.3 Processor Unit ..................................1-21
1.4 Control Unit .......................................1-22
1.5 Transceiver Unit................................1-26
1.6 Matching Box ....................................1-30
1.7 Control Box .......................................1-32
1.8 Extension Box ...................................1-33
1.9 How to Fill the Dome with Sonar Oil .1-34
1.10 Installing to an Existing Retraction
Tank ..................................................1-35
2. WIRING............................................2-1
2.1 Processor Unit ....................................2-4
2.2 Control Unit .......................................2-10
2.3 Transceiver Unit................................2-11
2.4 Control Box .......................................2-14
2.5 Matching Box ....................................2-23
2.6 Extension Box ...................................2-24
2.7 Input/Output Sentences (NMEA0183) .2-25
3. ADJUSTMENTS ..............................3-1
3.1 DIP Switch Settings in the Processor
Unit......................................................3-1
3.2 How to Change the Displayed
Language ............................................3-2
3.3 How to Register the Transducer
Position ...............................................3-3
3.4 Hull Unit Checks .................................3-5
3.5 How to Adjust the Heading .................3-8
3.6 How to Set the Stroke of the Hull Unit ...3-9
3.7 How to Configure the Own Ship Mark....3-9
3.8 How to Set Up a Secondary Monitor....3-10
3.9 How to Export/Import Backup Data...3-11
3.10 How to Backup/Load All Settings......3-14
3.11 How to Change the IP Address for the
Processor Unit and Transceiver Unit ...3-15
3.12 How to Set the System Time ............3-16
3.13 How to Restore Factory Default........3-17
3.14 Error Code List..................................3-17
3.15 How to Register Motor Operating
Times ................................................3-18
3.16 How to Set the Year/Month of Oil
Change .............................................3-20
3.17 [Installation Setting] Menu.................3-21
APPENDIX 1 JIS CABLE GUIDE.....AP-1
APPENDIX 2 INSTALLATION CHECK
LIST ............................AP-2
PACKING LISTS ................................. A-1
OUTLINE DRAWINGS ........................ D-1
INTERCONNECTION DIAGRAMS ..... S-1
Содержание FSV-75
Страница 50: ...1 MOUNTING 1 42 This page is intentionally left blank ...
Страница 118: ...D 1 6 Mar 2019 H MAKI ...
Страница 119: ...D 2 22 Aug 2018 H MAKI ...
Страница 120: ...D 3 22 Aug 2018 H MAKI ...
Страница 121: ...D 4 5 Dec 2018 H MAKI ...
Страница 122: ...D 5 5 Dec 2018 H MAKI ...
Страница 123: ...D 6 16 Apr 2019 H MAKi ...
Страница 124: ...D 7 16 Apr 2019 H MAKI ...
Страница 125: ...D 8 16 Apr 2019 H MAKI ...
Страница 126: ...D 9 16 Apr 2019 H MAKI ...
Страница 127: ...D 10 9 Oct 2018 H MAKI ...
Страница 128: ...D 11 22 Apr 2019 H MAKI ...
Страница 129: ...D 12 9 Oct 2018 H MAKI ...
Страница 130: ...D 13 9 Oct 2018 H MAKI ...
Страница 131: ...D 14 6 Mar 2019 H MAKI ...
Страница 132: ...D 15 19 Nov 2018 H MAKI ...
Страница 133: ...D 16 8 Jan 2019 H MAKI ...