1. MOUNTING
1-15
8. Reattach the trunnion receptacle.
9. Assemble the cable gasket on the top of the main shaft.
Note:
The following marking appears on the cable gasket and transducer cable.
Assemble the cable gasket so that each marking points toward the ship’s bow.
10. Remove the four bolts inserted to the tank guide at step 4.
11. Raise the transducer manually.
12. Secure the transducer cable with the three clamps indicated at step 1.
Note:
For how to route the transducer cable, see page 2-3.
1.2.10
How to check the soundome assembly operation
After installing the hull unit, check the soundome assembly operation before wiring.
1. Prepare a power cable (supplied locally) to supply the power to the soundome as-
sembly.
2. Turn the control box breaker off.
These markings must be
faced toward the bow.
Terminal block 733-112-FUR
Pins 1 through 8
are not used.
48 VDC
4.5 A
Power Supply
*
*
: Recommended
• Manufacturer: COSEL CO., LTD.
• Model: PJA300F-48
1 2 3 4 5 6 7 8 9 10 11 12
+
-
Содержание FSV-75
Страница 50: ...1 MOUNTING 1 42 This page is intentionally left blank ...
Страница 118: ...D 1 6 Mar 2019 H MAKI ...
Страница 119: ...D 2 22 Aug 2018 H MAKI ...
Страница 120: ...D 3 22 Aug 2018 H MAKI ...
Страница 121: ...D 4 5 Dec 2018 H MAKI ...
Страница 122: ...D 5 5 Dec 2018 H MAKI ...
Страница 123: ...D 6 16 Apr 2019 H MAKi ...
Страница 124: ...D 7 16 Apr 2019 H MAKI ...
Страница 125: ...D 8 16 Apr 2019 H MAKI ...
Страница 126: ...D 9 16 Apr 2019 H MAKI ...
Страница 127: ...D 10 9 Oct 2018 H MAKI ...
Страница 128: ...D 11 22 Apr 2019 H MAKI ...
Страница 129: ...D 12 9 Oct 2018 H MAKI ...
Страница 130: ...D 13 9 Oct 2018 H MAKI ...
Страница 131: ...D 14 6 Mar 2019 H MAKI ...
Страница 132: ...D 15 19 Nov 2018 H MAKI ...
Страница 133: ...D 16 8 Jan 2019 H MAKI ...