2. WIRING
2-5
2.1.2
Internal wiring and cable clamp position
*1
: Fabricate the cables referring to section 2.1.3.
*2
: To connect an external switch, see section 2.1.5.
*
3
: To connect an external KP, see section 2.1.6.
Clamp
position
Connect to
Cable from
Cable
1
TB3
NMEA0183 equipment
TTYCSLA-1Q*
1
2
TB4
3
TB5
4
TB6
5
TB7
6
TB10
Transceiver unit
10S2380*
1
7
TB2
Gyrocompass (AD-10)
TTYCSLA-1Q*
1
8
J1
Control unit
-
9
J2
Control unit
-
10
TB1
Remote controller, external switch*
2
-
11
TB8
External KP*
3
TTYCSLA-1*
1
12
TB9
External echo sounder
TTYCSLA-1Q*
1
1
2
3
4
5 11 12
6 7
8 9 10
TB3
TB4
TB10
TB5
TB2
TB6
J1
TB7
J2
TB8
TB1
TB9
Secure each cable to the
wiring clamp.
Terminal opener
Cable clamp
Fasten the crimp-on lug (drain
wire) of the TTYCSLA cable.
Содержание FSV-75
Страница 50: ...1 MOUNTING 1 42 This page is intentionally left blank ...
Страница 118: ...D 1 6 Mar 2019 H MAKI ...
Страница 119: ...D 2 22 Aug 2018 H MAKI ...
Страница 120: ...D 3 22 Aug 2018 H MAKI ...
Страница 121: ...D 4 5 Dec 2018 H MAKI ...
Страница 122: ...D 5 5 Dec 2018 H MAKI ...
Страница 123: ...D 6 16 Apr 2019 H MAKi ...
Страница 124: ...D 7 16 Apr 2019 H MAKI ...
Страница 125: ...D 8 16 Apr 2019 H MAKI ...
Страница 126: ...D 9 16 Apr 2019 H MAKI ...
Страница 127: ...D 10 9 Oct 2018 H MAKI ...
Страница 128: ...D 11 22 Apr 2019 H MAKI ...
Страница 129: ...D 12 9 Oct 2018 H MAKI ...
Страница 130: ...D 13 9 Oct 2018 H MAKI ...
Страница 131: ...D 14 6 Mar 2019 H MAKI ...
Страница 132: ...D 15 19 Nov 2018 H MAKI ...
Страница 133: ...D 16 8 Jan 2019 H MAKI ...