AP-2
APPENDIX 2 INSTALLATION CHECK
LIST
After completing the installation, perform the following checks:
Check point
Reference
Result
Hardware installation check
Sonar oil
The dome is filled with the sonar oil.
O-ring in the retraction
tank flange
O-ring, gasket* and insulation packing* are
attached to the retraction tank flange.
*: Attached only when the attachment kit or
attachment flange is used.
Tank guide position at
transducer full protrusion
Lower the transducer until fully protruded,
then confirm that the rollers on the tank guide
are not projected from the retraction tank.
Tank guide must be positioned 30 mm inside
from the bottom of the retraction tank.
-
Bow mark direction of the
transducer
Confirm that the bow mark on the transducer
faces the bow direction.
Soundome assembly op-
eration check
Check the LEDs in the control box to perform
the soundome assembly operation check.
Input voltage toggle
switch on the transceiver
unit
Input voltage toggle switches on the trans-
ceiver unit are changed correctly, depending
on the input voltage.
Vibration and sound
while raising/lowering the
transducer
Confirm that abnormal vibration or noise is
not generated from the hull unit while raising/
lowering the transducer.
-
Software setting check
Language setting
The language in which the menus and indi-
cations is changed as necessary.
Year/Month of oil change Register the year and month of the sonar oil
change.
Transducer position reg-
istration
The transducer position registration is com-
pleted.
Turn the transmission on Change the transmission status from [OFF]
to [ON].
Heading Correction
Adjust the heading so an echo which is dead
ahead appears dead ahead on the display.
Direction offset of the
motion sensor
Offset the direction difference between the
[Reference Direction] mark on the motion
sensor and bow direction.
Stroke setting
Select 800 mm or 1100 mm according to the
stroke (length) of your hull unit.
External data setting
Set the baud rate for the NMEA2000 port and
select the input format for external data.
System time setting
Set the system time and time zone.
Save ship’s original set-
ting
Save all menu settings in the internal memo-
ry as necessary.
Содержание FSV-75
Страница 50: ...1 MOUNTING 1 42 This page is intentionally left blank ...
Страница 118: ...D 1 6 Mar 2019 H MAKI ...
Страница 119: ...D 2 22 Aug 2018 H MAKI ...
Страница 120: ...D 3 22 Aug 2018 H MAKI ...
Страница 121: ...D 4 5 Dec 2018 H MAKI ...
Страница 122: ...D 5 5 Dec 2018 H MAKI ...
Страница 123: ...D 6 16 Apr 2019 H MAKi ...
Страница 124: ...D 7 16 Apr 2019 H MAKI ...
Страница 125: ...D 8 16 Apr 2019 H MAKI ...
Страница 126: ...D 9 16 Apr 2019 H MAKI ...
Страница 127: ...D 10 9 Oct 2018 H MAKI ...
Страница 128: ...D 11 22 Apr 2019 H MAKI ...
Страница 129: ...D 12 9 Oct 2018 H MAKI ...
Страница 130: ...D 13 9 Oct 2018 H MAKI ...
Страница 131: ...D 14 6 Mar 2019 H MAKI ...
Страница 132: ...D 15 19 Nov 2018 H MAKI ...
Страница 133: ...D 16 8 Jan 2019 H MAKI ...