1. OPERATIONAL OVERVIEW
1-11
PV TEST CALL is pending.
PV test pending by LES
TEST-RECEIVING MESSAGE
Receiving test message from LES
TEST-SENDING MESSAGE
Sending test message to LES
TEST-DISTRESS ALERT
Sending test distress alert to LES
WAITING FOR ACTIVATION
Waiting start of PV test
WAITING FOR TEST RESULT
Waiting for results of PV test
CLEARING
Clearing PV test
PV TEST is Completed.
PV test is completed.
PV TEST Failure.
PV test failed.
(4b) RF CON/CPU’s program version number
DCE F15 Ver. XX (XX = Version Number)
Note:
Error message is displayed when equipment abnormality is detected.
(5) Frame synchronization
Blank
Changing channel, or during transmission
SYNC (NCS)
Synchronizing with NCS
SYNC (LES)
Synchronizing with LES
MES Sig. Ch
Changing MES signaling channel
MES Msg. Ch
Changing MES message channel
UNSYNC
Out of synchronization
Retuning
Synchronizing with NCS or LES
(6) Ocean region receiving
No display
Out of synch with satellite
AOR-W
Atlantic Ocean Region-West
AOR-E
Atlantic Ocean Region-East
IOR
Indian Ocean Region
POR Pacific
Ocean
Region
(7) Logging status
LOGOUT
Logged out with ocean region
LOGIN
Logged in with ocean region
LOGIN (Flashing)
Logging in with ocean region
Содержание FELCOM 15
Страница 1: ...INMARSAT C MOBILE EARTH STATION MODEL FELCOM 15 ...
Страница 96: ...3 FILE OPERATIONS 3 22 This page intentionally left blank ...
Страница 132: ...4 INMARSAT C COMMUNICATIONS 4 36 This page intentionally left blank ...
Страница 203: ...APPENDIX AP 37 Antenna unit ANT RF Board 16P0207 ANT B Board 16P0206 Antenna unit cover opened ...
Страница 204: ...APPENDIX AP 38 This page intentionally left blank ...
Страница 206: ...This page is intentionally left blank ...
Страница 210: ......