2. WIRING
13
8. TIghten the lock nut inside the unit to fasten the super glands (two pcs., see step 12). The
torque for the lock nut shall be 1.8 - 2.0 N/m.
9. Set the nut material (removed at step 6) inside the unit, align its two protrusions with the lower
holes on the rainproofing panel. Use the remaining two screws removed at step 5 to fasten
the lower two holes on the rainproofing panel.
10. Use two screws to fasten the clamp removed at step 4.
Super gland (two pcs.)
Fasten lower two holes
Содержание DFF1-UHD
Страница 1: ...NETWORK FISH FINDER DFF1 UHD OPERATOR S MANUAL www furuno com Model...
Страница 2: ......
Страница 34: ...7 Dec 2012 Y NISHIYAMA...
Страница 38: ......
Страница 39: ......