2. WIRING
2-2
Wiring diagram
Ship's mains
a
1 2 13 14 3 4 11 12 5 6
9 10 7 8
Remove sheath up to point a .
Transducer cable 10S1943, 6.6 m *3
Processor unit
Secure with cable tie.
Connector box
(Assemble
locally)
Transceiver
unit
CN-B1
CN-B2
CN-B3
HULL cable
S10-15-5, 5 m
S10-15-10, 10 m
S06-6-10
(5-5P),10 m
Motion sensor
MS-100
*1: Dress cable in field.
Display unit
(User supply)
Monitor cable
3COX-2P-6C 5M, 5 m
3COX-2P-6C 10M, 10 m
5 m/10 m
Control unit
Processor cable
S10-6-15, 15 m
S10-6-30, 30 m
S10-6-50, 50 m
DPYCY-4 (Local supply), 50 m
*5
*2
*1
DPYCY-4 , 50 m
*5
DC-AC inverter
TR-2451
DPYCY-6 (Local supply), 5 m
*5
Ship's mains
24 VDC
100/115/200/220/240 VAC
1ø, 50-60 Hz
*1
*4
CN-A1
REMOTE
*4: For connections with external equipment, see page 2-11.
*5: JIS (Japan Industry Standards) cable or equivalent.
(See Appendix 1.)
*2: 10 m hull cable is for the transducer cable extension kit.
*3: Use the transducer cable extension kit to extend the
transducer cable.
Содержание CSH-8LMARK-2
Страница 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Страница 44: ...2 WIRING 2 18 This page is intentionally left blank ...
Страница 58: ... 3 ...
Страница 61: ...A 1 A 2 ...
Страница 62: ...A 3 A 4 ...
Страница 63: ...A 5 A 6 ...
Страница 64: ......
Страница 65: ...8 May 2013 H MAKI D 2 ...
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ...D 9 ...
Страница 73: ...D 10 ...
Страница 74: ...D 11 ...
Страница 75: ...D 12 ...
Страница 76: ...D 13 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI ...
Страница 77: ...D 14 ...
Страница 78: ...D 15 ...
Страница 79: ...D 16 ...
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ...D 20 D 20 D 20 D 20 ...
Страница 84: ......