1. MOUNTING
1-9
12. Fix anti-vibration stays to the retraction tank.
Anti-vibration stays should be fixed to directions of ship’s bow – stern and port –
starboard.
Fixing anti-vibration stays to retraction tank
13. Orient the main shaft so that the bow mark faces ship’s bow and fix it securely with
the shaft retainer.
Orienting the main shaft
Anti-vibration stay
WARNING
Bow mark
Bow
Tighten bolts fixing shaft retainer for
torque of 35 to 38 N m.
If torque is less than the above, water
leakage may occur because the shaft
may loosen and fall.
Loosen shaft retainer
and rotate main shaft
so that the bow mark
faces ship's bow.
Содержание CSH-8LMARK-2
Страница 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Страница 44: ...2 WIRING 2 18 This page is intentionally left blank ...
Страница 58: ... 3 ...
Страница 61: ...A 1 A 2 ...
Страница 62: ...A 3 A 4 ...
Страница 63: ...A 5 A 6 ...
Страница 64: ......
Страница 65: ...8 May 2013 H MAKI D 2 ...
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ...D 9 ...
Страница 73: ...D 10 ...
Страница 74: ...D 11 ...
Страница 75: ...D 12 ...
Страница 76: ...D 13 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI ...
Страница 77: ...D 14 ...
Страница 78: ...D 15 ...
Страница 79: ...D 16 ...
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ...D 20 D 20 D 20 D 20 ...
Страница 84: ......