APPENDIX
AP-3
5. Pass the main shaft through the main body flange and assemble the hull unit. Refer to
Chapter 1 for the assembling procedure.
6. Clean the top of the main shaft with alcohol, install the waterproofing attachment and
apply Lock-tight (supplied) to the lock-screw.
Clean with alcohole
and apply Lock-tight.
30 mm
Shaft
Waterproofing
attachment
•
Tighten the M6 socket-set screws with a torque of 3.92 to 4.9 N
·
m.
•
Refer to page 1-6 for installing the waterproof attachment.
7. Assemble the hull unit, taking the following points into account:
1)
The shaft retainer should be in contact with the waterproofing attachment.
2)
The fastening band should not be used on the main shaft when it is fitted with the
waterproofing attachment.
3)
When the main shaft is installed without cutting position the shaft retainer as
below.
As shown on page AP-5,
length is cut 45 mm.
Содержание CSH-8L
Страница 8: ...vi This page intentionally left blank ...
Страница 19: ...1 MOUNTING 1 11 Hull unit shipment lists ...
Страница 20: ...1 MOUNTING 1 12 ...
Страница 66: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ...This page is intentionally left blank ...
Страница 79: ...14 Apr 09 R Esumi ...
Страница 80: ...14 Apr 09 R Esumi ...
Страница 81: ...14 Apr 09 R Esumi ...
Страница 82: ...14 Apr 09 R Esumi ...
Страница 83: ...16 Feb 10 R Esumi ...
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ...This page is intentionally left blank ...
Страница 95: ...This page is intentionally left blank ...