![Furuno CSH-8L Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/furuno/csh-8l/csh-8l_installation-manual_2350652017.webp)
1. MOUNTING
1-9
11. Fasten the hull unit to the retraction tank.
Gasket
M20
M20 Spring washer
M20 Flat washer
M20
Flat washer
M20x80
45
Raise/lower drive assy
BOW
Orient the hull unit as shown.
This will reduce shock and
vibration, caused by ship's
pitching and rolling, at the
raise/lower drive assy.
Fastening the hull unit to the retraction tank
12. Fix anti-vibration stays to the retraction tank.
Anti-vibration stays should be fixed to directions of ship’s bow – stern and port – starboard.
Anti-vibration
stay
Fixing anti-vibration stays to retraction tank
Содержание CSH-8L
Страница 8: ...vi This page intentionally left blank ...
Страница 19: ...1 MOUNTING 1 11 Hull unit shipment lists ...
Страница 20: ...1 MOUNTING 1 12 ...
Страница 66: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ...This page is intentionally left blank ...
Страница 79: ...14 Apr 09 R Esumi ...
Страница 80: ...14 Apr 09 R Esumi ...
Страница 81: ...14 Apr 09 R Esumi ...
Страница 82: ...14 Apr 09 R Esumi ...
Страница 83: ...16 Feb 10 R Esumi ...
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ...This page is intentionally left blank ...
Страница 95: ...This page is intentionally left blank ...