APPENDIX
AP-2
2. Cut the main shaft to the necessary length.
•
It is recommended to use a machine lathe to shorten the shaft.
•
Chamfer the top of the main shaft as shown below. (For chamfering with a file use a fine
file and finish the surface as smooth as possible.)
•
When clamping the shaft with a clamp, be careful not to damage the shaft surface.
•
When a metal saw is used to shorten the shaft, finish the top of the shaft so that it is level
within 3 mm.
Within 3 mm
C1
R1
3. Temporarily install the waterproofing attachment on the top of the main shaft and drill
holes for socket-set screws.
Shaft
Waterproofing
attachment
O-ring
M6 socket-set screw
30 mm
Push in fully (O-ring will resist.)
a) Mark drilling point on the shaft surface by tightening M6 socket-set screws (2 pcs.)
b) Remove the waterproofing attachment.
c) Drill holes les than 2 mm in depth. Use a drill with a Ø120 tip°. Do not drill holes through
the shaft. Use a stainless steel, low rpm drill with cutting oil.
Less than 2 mm
5 mm
Cut level.
4. Remove the sheath of the transducer cable and wrap the sheath end with vinyl tape.
Frange bottom
L
Remove sheath.
L = Main shaft 120 mm
Содержание CSH-8L
Страница 8: ...vi This page intentionally left blank ...
Страница 19: ...1 MOUNTING 1 11 Hull unit shipment lists ...
Страница 20: ...1 MOUNTING 1 12 ...
Страница 66: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ...This page is intentionally left blank ...
Страница 79: ...14 Apr 09 R Esumi ...
Страница 80: ...14 Apr 09 R Esumi ...
Страница 81: ...14 Apr 09 R Esumi ...
Страница 82: ...14 Apr 09 R Esumi ...
Страница 83: ...16 Feb 10 R Esumi ...
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ...This page is intentionally left blank ...
Страница 95: ...This page is intentionally left blank ...