2. WIRING
2-3
2.2
Hull unit/Pre-amplifier Unit
2.2.1
Running transducer cable
Excessive stress should not be placed on the transducer cables (12 pcs.) during raise/lower
operation. Follow the procedure below to run the cables.
1. Fix the 12 transducer cables with the cable clamp [A].
Cable clamp [A]
Cable clamp [B]
Raise/lower
drive assembly
Cable clamp (1)
2. Temporarily fix cable clamp [B]. Note the positions of cable in clamps [A] and [B] as
shown below.
Cable
clamp [A]
Cable clamp [B]
Ex) The cable which is fixed at
(a) of the clamp [A] should be
wired to (a) of the clamp [B].
Cable clamp (2)
Содержание CSH-5L
Страница 1: ...PRINTED IN JAPAN COLOR SCANNING SONAR CSH 5L ...
Страница 18: ...1 MOUNTING 1 10 ...
Страница 19: ...1 MOUNTING 1 11 ...
Страница 64: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ......
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ......
Страница 99: ......
Страница 100: ......