Termination Instructions
12
Install Cable Anchor
• Pull aramid yarn strands back over stripped fiber.
• Holding aramid yarn and fiber at very top. Feed the
fiber and the aramid yarn through the CABLE AN-
CHOR. Bottom out the anchor on the cable sub-unit
outer jacket using a clockwise turning motion. (i.e.
screw the anchor onto the cable outer jacket, if
necessary)
• Position anchor in CRIMP TOOL,
centering the rear end of the anchor in the crimp nest.
• Squeeze crimp tool handles together until it clicks, then releases.
STEP
5
NOTE:
Be careful not to touch the HCS fiber
coating once the fiber has been stripped.
The coating will retain finger oils which
can transfer to and damage the gripper
pads in the cleaver during Step 9 in the
termination process.