
20-G 1/01
Problem
Cause
Remedy
Poor Combustion
1. Refractories
Check refractories to see if they are plugged with soot or
broken in pieces. Clean or replace as necessary.
2. Air Adjustment
Check main air adjustment to see if it is loosened up.
Adjust as necessary and tighten plate in position. Check
CO
2
and O
2
levels.
3. Draft
Check draft with a gauge. Draft should be a -.02” to -.04”
W.C. with burner off or -.04” to -.06” when operating. May
need to install a barometric damper.
4. Dirty Flue
Check flue for carbon buildup or blockage. Clean flue
passages with brush.
5. Negative Room Pressure
Make sure no exhaust fans are running in the boiler room.
Burner back fires
1. Refractories
Check refractories to see if they are plugged with soot or
broken in pieces. Replace as necessary.
2. Ignition Electrodes
Check electrodes for carbon buildup and clean if necessary.
Check for proper adjustment. Readjust if necessary. Check
for cracks in porcelain; if found, replace.
3. UV Scanner
Check for dirt on flame scanner and clean.
Check for proper location of detector.
4. Draft
Check draft with a gauge. Draft should be a -.02” to -.04”
W.C. with burner off or -.04” to -.06” when operating. May
need to install a barometric damper.
5. Negative Room Pressure
Make sure no exhaust fans are running in the boiler room.
Boiler will not
1. Gas Supply
Check gas pressure coming into gas train. If low, contact
maintain pressure
gas company. Should be 7” to 11” W.C. Check coil in
gas valve with AMP meter. Replace if bad. Check gas
regulator setting and readjust as necessary.
2. Dirty Flue
Check flue for carbon buildup or blockage. Clean flue
passages with brush.
3. Pressuretrol
Disconnect all power to the controller. Disconnect the wires
from the controller. Put an OHM meter between the switch
terminals. Lower the set point and recheck with OHM meter.
Switch should break. If the controller operates improperly,
replace it.
4. Scale Built up in boiler
Refer to Section 2 “Pressure Vessel Cleaning”.
5. Refractories
Check refractories to see if they are cracked or broken
in pieces. Replace as necessary.
6. Steam traps
Check traps to see if they are clean or replace as necessary.
blowing through
7. Boiler size
Boiler may be undersized.
LE Maintenance
Содержание FB-A 10
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ...2 G 1 01...
Страница 9: ...Safety Warnings Precautions 1 3 G 1 01...
Страница 10: ...4 G 1 01...
Страница 12: ...6 G 1 01...
Страница 13: ...7 G 1 01 Description Instructions LE...
Страница 14: ...8 G 1 01...
Страница 17: ...11 G 1 01 Operation LE...
Страница 18: ...12 G 1 01...
Страница 20: ...14 G 1 01...
Страница 21: ...15 G 1 01 Maintenance LE...
Страница 22: ...16 G 1 01...
Страница 29: ...23 G 1 01 Parts LE...
Страница 30: ...24 G 1 01...
Страница 32: ...26 G 1 01...
Страница 33: ...Boiler Description Instructions Gas Fired Boiler 2 27 G 1 01...
Страница 37: ...30 G 1 01 Description Instructions I E K K J K D C H B A G F...
Страница 50: ...42b G 1 01...
Страница 51: ...43D G 1 01 Operation 3...
Страница 52: ...43b G 1 01...
Страница 59: ...Maintenance 4 5 G 1 01...
Страница 60: ...51 G 1 01...
Страница 73: ...Parts 5 6 G 1 01...
Страница 88: ...79 G 1 01 Parts...
Страница 90: ...81 G 1 01 Parts Gas Burner Ignition Assembly Gas Burner Components...
Страница 95: ...Warranty 6 8 G 1 01...
Страница 96: ...87 G 1 01...
Страница 98: ...89 G 1 01...
Страница 100: ...91 G 1 01...
Страница 101: ...Component Data Sheets 7 G 1 01...
Страница 102: ......