- (01-11) -
2-5. UTZ-BD100B
NO.
Parts Name
Qty.
Material
Remarks
1 Frame
1 Galvanized sheets
2 Adapter
4 Galvanized sheets
3 Electrical Equipment Box
1
4 Inspection Cover
1 Galvanized sheets
5 Fan
2 ABS
6 Motor
2
7 Heat Exchange Element
4 Special paper + Resin
8 Filter
2
Nylon-Polyester Fiber Collection Efficiency AFI 82%
9 Damper
1
10 Damper Motor
1
11 Ceiling Suspension Fixture 4 Galvanized sheets
BE CAREFUL OF DEWING AND
FROSTING
As shown in the Figure, suppose a high temp absorbing air condition
A and a low temp absorbing air condition B are plotted on the air line
figure, then a high temp air A is heat-exchanged by the unit and goes
out of the saturation curve as shown by Point C.
In this case, the unit will be dewed or frosted.
To aboid this, you are required to heat a low temp air B up to B’ so as
to get C’ below the saturation curve, before using the unit.
saturationcurve
Dry-bulb temperature (˚C)
Absolite humidity
(kg/kg’)
C’
C
B
B’
A
REFERENCE SKETCH
Pipe Hood
Outside Intake Duct
Ceilling Suspension Bolts
Supply Air Duct
EA
(Exhaust
Air)
OA
(Outside intake Air)
RA
(Room Air)
SA
(Supply Air)
Inside Supply Opening
(Supply/Exhaust Air Grill)
Room Intake Opening
(Supply/Exhaust Air Grill)
Room Intake Duct
Heat Insulation Material
Exhaust Air Duct
The two outside ducts(the Outside Intake Duct and the
Exhaust Duct)must be insulated to prevent condensation.
(Material;Glass wool, Thickness;25)
Duct size (Nominal Diameter): ø250
The above dimensions do not include the thickness of
the insulasion material on the unit body.
②
⑤
⑥
⑩
⑨
①
⑦
⑪
1134
600
228
678
228
EA
OA
(Exhaust Air)
(Outside Air)
1250
Maintenance Space
Inspection Opening □450
(For the inspection of the filters, heat exchange elements, fans, motors, and damper)
4-13×30 Oval hole
· Suspension Fittings
19
1190
19
RA
SA
(Room Air)
(Supply Air)
⑧
An inspection opening is necessary to
clean the heat exchange element and
filter once or twice a year.
388
194
218
247
101
80
④
⑧
③
1322
612
85
85
Wiring Diagram
Earth Terminal
Ø258
Ø242
157 184