Installation Steps
Hardware Installation
4.1
Installation Steps
The following installation steps are described in detail in other sections of this
chapter:
Ê
Unpacking the server (see next section “Unpacking the Server”).
Ê
There can be additional ordered bulk components delivered with the server.
For mounting refer to the original component documentation.
Ê
Setting up the floorstand model (see section “Setting Up the Floorstand
Model” on page 27) or mounting the rack model into the rack (see the layout
arrangement created with
System Architect
on the order lists) as described in
section “Installing/Removing the Rack Model into the Rack” on page 29.
Ê
Cabling the server. Please also refer to the Technical Manual for the corre-
sponding rack and the section “Instructions on Connecting and Discon-
necting Cables” on page 52.
Ê
Connect the server to the power supply (see section “Connecting the Server
to the Line Voltage” on page 51).
4.2
Unpacking the Server
V
CAUTION!
Please note the safety instructions in chapter “Important Notes” on page 13.
If you need to lift or transport the server, ask other people to help you.
Do not unpack the server until it is at its installation location.
Ê
Transport the server to the place where you want to set it up.
It is recommended not to throw away the original packaging material as it may
be required for transportation at a later date.
Ê
Unpack all individual parts.
Ê
Check the delivery for any damage during transport.
Ê
Check whether the delivery agrees with the details on the delivery receipt.
The identification rating plate is located on the rear area on the server.
Notify your supplier immediately should you discover that the delivery does not
correspond to the delivery receipt.