TX100 S3
Upgrade and Maintenance Manual
173
Expansion cards and backup units
9.3.2
Installing an FBU
V
CAUTION!
For further safety information, please refer to
"Important information" on
page 29
.
9.3.2.1
Required tools
●
Preliminary and concluding steps: tool-less
●
Mounting TFM module: Phillips PH1 / (+) No. 1 screw driver
●
Installing an FBU: tool-less
9.3.2.2
Preliminary steps
Before installing an FBU, perform the following steps:
Ê
Shut down the server as described in section
"Shutting down the server" on
page 42
.
Ê
Remove the AC power cord from the cable tie and disconnect it from the
system as described in section
"Disconnecting power cord" on page 43
.
Ê
Bring the server to its horizontal position.
Ê
Open the side cover as described in section
"Removing the side cover" on
page 45
.
Upgrade and Repair Units (URU)
Average task duration: 5 minutes
Содержание PRIMERGY TX100 S3
Страница 16: ...TX100 S3 Upgrade and Maintenance Manual Version history ...
Страница 40: ...40 Upgrade and Maintenance Manual TX100 S3 Important information ...
Страница 68: ...68 Upgrade and Maintenance Manual TX100 S3 Basic hardware procedures ...
Страница 86: ...86 Upgrade and Maintenance Manual TX100 S3 Basic software procedures ...
Страница 104: ...104 Upgrade and Maintenance Manual TX100 S3 Power supply ...
Страница 126: ...126 Upgrade and Maintenance Manual TX100 S3 Hard disk drives ...
Страница 146: ...146 Upgrade and Maintenance Manual TX100 S3 System fan modules ...
Страница 200: ...200 Upgrade and Maintenance Manual TX100 S3 Expansion cards and backup units ...
Страница 234: ...234 Upgrade and Maintenance Manual TX100 S3 Processor ...
Страница 272: ...272 Upgrade and Maintenance Manual TX100 S3 Accessible drives ...
Страница 288: ...288 Upgrade and Maintenance Manual TX100 S3 Front panel and external connectors ...