![Fujitsu PRIMERGY SX960 S1 Скачать руководство пользователя страница 43](http://html.mh-extra.com/html/fujitsu/primergy-sx960-s1/primergy-sx960-s1_operating-manual_121604043.webp)
SX960 S1
Operating Manual
43
Hot-plug components
Removing the HDD/SSD module
V
CAUTION!
Replace an HDD/SSD module only while the system is powered on.
Replacing an HDD/SSD module while the system is off would impact the
RAID configuration at the next power up.
If you want to remove an HDD/SSD module during operation, proceed as
follows:
Ê
If you want to remove an HDD/SSD module that is not defective, the drive
must be first set to offline via the software (RAID controller configuration
software).
Ê
Unlock the HDD/SSD module as described in section
"Unlocking the
HDD/SSD module" on page 41
.
Ê
Pull the HDD/SSD module out a few centimeters.
Ê
Wait for at least 60 seconds.
I
This period is necessary for the RAID controller to recognize that an
HDD/SSD module has been removed and for the drive to come to a
stop.
Ê
Pull the HDD/SSD module out completely.
Ê
Install the new HDD/SSD module, as described in sections
"Unlocking the
HDD/SSD module" on page 41
and
"Installing the HDD/SSD module" on
page 42
.
V
CAUTION!
If you have removed an HDD/SSD module and do not install a new
one in its place, put the dummy module back in its place for cooling,
to comply with EMC regulations (regulations regarding
electromagnetic compatibility), and for protection against fire. Ensure
that the dummy module engages correctly in the slot.