Power-on indicator / AC connected indicator (2)
Status
Description
off
The server is switched off and not connected to the
mains.
green on
The server is switched on.
flashing white
The iRMC firmware is starting up after the server has
been connected to the mains.
white on
The server is switched off and connected to the mains
(standby mode).
After connecting the server to the mains, it
will take about 60 seconds until the server
will enter standby mode and can be switched
on.
exchange flashing
green and white
The server has been switched on but Power Cycle
Delay settings delay it from turning on for a specified
time.
CSS indicator (3)
Status
Description
off
No critical event detected (CSS component).
orange on
Prefailure event detected (CSS component).
For HDDs, see also
flashing orange
CSS component failure detected.
Global Error indicator (4)
"iRMC-related status signals" on page 551
Status
Description
off
No critical event detected (non-CSS component).
orange on
Prefailure event detected (non-CSS component).
Appendix A
550
Upgrade and Maintenance Manual
RX2540 M6
Содержание PRIMERGY RX2540 M6
Страница 8: ...Upgrade and Maintenance Manual RX2540 M6 ...
Страница 34: ...Before you start 34 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 86: ...Basic hardware procedures 86 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 120: ...Basic software procedures 120 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 232: ...Fans 232 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 328: ...Expansion cards and backup units 328 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 366: ...Processor CPU 366 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 462: ...Front panel 462 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 570: ...Appendix A 570 Upgrade and Maintenance Manual RX2540 M6 ...
Страница 572: ...FUJITSU Server PRIMERGY RX2540 M6 System Cabling Overview System Cabling Overview English Cable Plan for June 2021 ...
Страница 581: ...10 RX2540 M6 Basic Serial Cable Plan System Board D3891 A B Rear Serial CA05950 2142 Rear Serial ...
Страница 582: ...11 RX2540 M6 Basic LTO 16x2 5 Cable Plan System Board D3891 A B PWR 6 LTO CA05950 2144 MLC1 MLC2 C0 C1 Route via CPU2 ...
Страница 584: ...13 RX2540 M6 Basic OOB 10x3 5 Cable Plan System Board D3891 A B SMB 1 10x 3 5 HDD Backplane SMB 1 CA05950 2105 SB BP ...
Страница 585: ...14 RX2540 M6 Basic OOB 12x3 5 Cable Plan System Board D3891 A B SMB1 12x 3 5 HDD Backplane SMB 1 CA05950 2105 SB BP ...
Страница 593: ...22 RX2540 M6 Power 10x3 5 Cable Plan CA05950 2112 System Board D3891 A B PWR 2 10x3 5 HDD Backplane PWR 1 ...
Страница 594: ...23 RX2540 M6 Power 12x3 5 Cable Plan CA05950 2112 System Board D3891 A B PWR 2 12x3 5 HDD Backplane PWR 1 ...
Страница 600: ...29 RX2540 M6 Power Rear 4x2 5 Cable Plan System Board D3891 A B PWR 1 4x2 5 rear HDD Backplane CA05950 2136 PWR 9 ...
Страница 601: ...30 RX2540 M6 Power Rear 2x2 5 Cable Plan System Board D3891 A B PWR 1 2x2 5 rear HDD Backplane CA05950 2137 PWR 10 ...
Страница 602: ...31 RX2540 M6 Power Internal RAID Riser Cable Plan CA05950 2110 System Board D3891 A B PWR 1 Internal RAID Riser PWR 1 ...
Страница 667: ...96 RX2540 M6 Data Dual microSD 64GB Enterprise Cable Plan Dual microSD 64GB Enterprise A B ROC CON2 Y4018 V8 ...
Страница 672: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT June 2021 ...