![background image](http://html.mh-extra.com/html/fujitsu/primergy-pg-r1ck21/primergy-pg-r1ck21_manual_120455035.webp)
2 Before starting operations
35
E
2
Before starting operations
This chapter explains the workflow for conversion and required preparations.
2.1
Workflow
Remove the hard disk units.
Pre-work preparations.
Remove the covers from a tower type.
Reposition the operator panel and 5-inch storage bays.
Attach the covers to a rackmount type.
Install the server in the rack.
Reinstall the hard disk units.
After conversion
- Check various items before turning on the power
- Update the chassis ID