152
Upgrade and Maintenance Manual
CX2550 M1
System board and components
9.1.4
Concluding steps
Perform the following procedures:
Ê
Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê
"Installing the server node in the server enclosure" on page 50
Ê
If applicable, reconnect all external cables.
Ê
"Controls and indicators on the server node" on page 51
Ê
"Verifying the system time settings" on page 75
Содержание PRIMERGY CX2550 M1
Страница 14: ...Upgrade and Maintenance Manual CX2550 M1 Contents ...
Страница 52: ...52 Upgrade and Maintenance Manual CX2550 M1 Basic hardware procedures ...
Страница 90: ...90 Upgrade and Maintenance Manual CX2550 M1 Basic software procedures ...
Страница 204: ...204 Upgrade and Maintenance Manual CX2550 M1 Liquid cooling ...
Страница 210: ...210 Upgrade and Maintenance Manual CX2550 M1 Cabling ...
Страница 222: ...222 Upgrade and Maintenance Manual CX2550 M1 Appendix ...