CX2550 M1
Upgrade and Maintenance Manual
95
Expansion cards
6.2
Additional tasks
This section provides additional expansion card related information on how to
install slot brackets and SFP+ transceiver modules.
I
For further instructions regarding controller settings, please refer to the
accompanying documentation.
6.2.1
Mounting expansion card slot brackets
6.2.1.1
General instructions
Ê
Place the controller on the mounting tabs on the slot bracket.
Ê
Secure the slot bracket to the controller with two M3 x 4.5 mm screws.
Removal is carried out in reverse order.
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools:
Phillips PH2 / (+) No. 2 screw driver
Содержание PRIMERGY CX2550 M1
Страница 14: ...Upgrade and Maintenance Manual CX2550 M1 Contents ...
Страница 52: ...52 Upgrade and Maintenance Manual CX2550 M1 Basic hardware procedures ...
Страница 90: ...90 Upgrade and Maintenance Manual CX2550 M1 Basic software procedures ...
Страница 204: ...204 Upgrade and Maintenance Manual CX2550 M1 Liquid cooling ...
Страница 210: ...210 Upgrade and Maintenance Manual CX2550 M1 Cabling ...
Страница 222: ...222 Upgrade and Maintenance Manual CX2550 M1 Appendix ...