80
Service Supplement
PRIMERGY CX122 S1
Replacing the system board
Figure 58: Installing the system board (A)
Ê
Hold the replacement system board by the memory module ejectors and the
PCI riser slot.
V
CAUTION!
●
Do not lift or handle the system board by any of its heat sinks!
●
Ensure not to damage the EMI springs to comply with applicable
EMC regulations and satisfy cooling requirements and fire
protection measures.
Ê
At a slight angle, insert the system board into the housing in the direction of
the arrow (1).
Ê
Carefully shift the system board towards the server front until the plug shells
engage with the cut-outs in the connector panel (2).
Содержание PRIMERGY CX122 S1
Страница 1: ...Service Supplement English PRIMERGY CX122 S1 Server Service Supplement November 2010 ...
Страница 10: ......
Страница 12: ......
Страница 20: ......
Страница 27: ...PRIMERGY CX122 S1 Service Supplement 25 Preparations Figure 8 LAN cabling color coding servers ...
Страница 92: ......