24
Service Supplement
PRIMERGY CX122 S1
Preparations
4.1.2.2
Network cabling
LAN cables are routed through cable guides on the right side of the rack and
connected to vertically mounted network switches. The cable guides ensure
that the network cables remain located at their designated height units, even if
they are unplugged for the purpose of replacing a server node.
Up to six color coded cable sets are employed on a
system unit, each of them assigned to one of the up to
six CX122 S1 LAN ports and one of up to six network
switches.
There are five different configurations of the
PRIMERGY CX1000 S1 system unit:
The color coded LAN cables are assigned to the PRIMERGY CX122 S1
network ports as follows:
LAN switches
Cable sets
S26361-
F3608-E1
1 (onboard LAN 1)
2 (onboard LAN 2)
green
blue
S26361-
F3608-E2
1 (onboard LAN 1)
2 (onboard LAN 2)
5 (Service LAN)
green
blue
black
S26361-
F3608-E3
1 (onboard LAN 1)
2 (onboard LAN 2)
3 (LAN Card 1)
4 (LAN Card 2)
green
blue
yellow
grey
S26361-
F3608-E4
1 (onboard LAN 1)
2 (onboard LAN 2)
3 (LAN Card 1)
4 (LAN Card 2)
5 (Service LAN)
green
blue
yellow
grey
black
S26361-
F3608-E5
1 (onboard LAN 1)
2 (onboard LAN 2)
3 (LAN Card 1)
4 (LAN Card 2)
5 (LAN Card 3)
6 (LAN Card 4)
green
blue
yellow
grey
black
red
Table 2: LAN cabling color coding (switches)
Содержание PRIMERGY CX122 S1
Страница 1: ...Service Supplement English PRIMERGY CX122 S1 Server Service Supplement November 2010 ...
Страница 10: ......
Страница 12: ......
Страница 20: ......
Страница 27: ...PRIMERGY CX122 S1 Service Supplement 25 Preparations Figure 8 LAN cabling color coding servers ...
Страница 92: ......