A.3 Bus Phases
Appendix A-17
After the ACK signal is false, the target may continue the transfer by driving the DB
(7-0, P) signals and asserting the REQ signal, as previously described
.
b.
Asynchronous transfer from initiator to target
If the I/O signal is false (transfer to the target), the target shall request information by
asserting the REQ signal. The initiator shall drive the DB (7-0, P) signals to their
desired values, delay at least one deskew delay plus a cable skew delay then assert the
ACK signal. The initiator shall continue to drive the DB (7-0, P) signals until the REQ
signal is false. When the ACK signal becomes true at the target, the target shall read
the DB (7-0, P) signals then negate the REQ signal. When the REQ signal becomes
false at the initiator, the initiator may change or release the DB (7-0, P) signals and
shall negate the ACK signal. The target may continue the transfer by asserting the
REQ signal, as previously described.
deskew delay +
cable skew
delay
deskew delay
+ cable skew
delay
bus settle delay
BSY
SEL
C/D, MSG
REQ
ACK
DB
I/O
Содержание M3097DG
Страница 1: ...C150 E103 01EN M3097DG Image Scanner OEM Manual ...
Страница 2: ......
Страница 4: ...This page is intentionally left blank ...
Страница 8: ...iv Appendix C Throughput Appendix C 1 C 1 Offline test Appendix C 1 C 2 Online test Appendix C 1 ...
Страница 44: ...3 3 Optional image function 3 23 ...
Страница 67: ...5 4 Consumable 5 13 Two rollers are included Figure 5 4 Pick roller ...
Страница 70: ...6 3 Figure 6 1 Jam clearance ...