IP-HE950 Hardware User's Guide
Appendix
Copyright 2017 FUJITSU LIMITED
70
A.4 On-Site Tune-Up Work
This chapter describes the on-site tune-up workflow.
Figure A.4-1 Workflow
Since this unit has a diversity of system configurations depending on the application, this section
covers the checking process for the unit alone.
START
Preparations
Environment check
Visual check of
appearance
Cable connection
Input voltage check
Power
-
on
Unit test
System test
END
A.4