Chapter 2
What You Must Know Before Using DR
2-23
2.4.3.3
Flowchart: Moving a System Board
The flow of DR operations and the transition of system board status when a system
board has been moved or reserved for a move are described in the schematic
flowchart, below.
Each system board status indicated in
is the main status that is changed.
For the flow of system board addition processing or deletion processing and the
related system board status, see
Section 2.4.3.1, “Flowchart: Adding a System Board”
or
Section 2.4.3.2, “Flowchart: Deleting a System Board” on page 2-21
respectively.
Содержание SPARC Enterprise M4000
Страница 1: ...Dynamic Reconfiguration DR User s Guide SPARC Enterprise M4000 M5000 M8000 M9000 Servers English ...
Страница 2: ......
Страница 6: ......
Страница 23: ...Preface xxi Reader s Comment Form ...
Страница 90: ...3 28 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 116: ...4 26 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 152: ...A 36 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 158: ...Glossary 4 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 161: ......