2-22
SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User’s Guide • September 2007
Each system board status indicated in
is the main status that is changed.
FIGURE 2-6
Flow of System Board Deletion Processing
Status of deletion from OS
Test: passed
Status of addition into OS
Test: passed
Request of
Domain configuration
Test: passed
Test: passed
Disconnection
Reboot of
Deletion/
Deletion from
DCL registration status
Test: passed
Deletion
Domain configurationchange
System board pool
Test: passed
Deletion from
deletion
reservation
Assignment: assigned
Connectivity: connected
Configuration: configured
deletion
from OS
Assignment: assigned
Connectivity: connected
Configuration: unconfigured
domain after
reservation
OS completed
change process
Assignment: a ssigned
Connectivity: connected
from
domain
Assignment: assigned
Connectivity: disconnected
Assignment: assigned
Domain
Assignment: available
from
DCL
completed
Содержание SPARC Enterprise M4000
Страница 1: ...Dynamic Reconfiguration DR User s Guide SPARC Enterprise M4000 M5000 M8000 M9000 Servers English ...
Страница 2: ......
Страница 6: ......
Страница 23: ...Preface xxi Reader s Comment Form ...
Страница 90: ...3 28 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 116: ...4 26 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 152: ...A 36 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 158: ...Glossary 4 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 161: ......