Chapter 2
What You Must Know Before Using DR
2-21
FIGURE 2-5
Flow of System Board Addition Processing
2.4.3.2
Flowchart: Deleting a System Board
The flow of DR operations and the transition of system board status when a system
board has been deleted or reserved for deletion are described in the schematic
flowchart, below.
System board pool
DCL registration status
Test: passed
registration
Add
Error status
Test: fail
Diagnosis
Test: testing
Request to add
Request to add system board,
Error found
Domain configuration
Test: passed
Test: passed
Connection
Diagnosis
Process of addition into OS
Test: passed
Test: passed
Incorpor-
Request of
Test: passed
Assignment: available
Addition or
reserva-
process
tion, DCL
registration
or
reservation
Assignment: assigned
system board
or domain reboot after
registration/reservation
operation
Assignment: assigned
Assignment: assigned
completed
change process
Assignment: assigned
Connectivity: disconnected
to domain
Assignment: assigned
Connectivity: connected
addition into OS
Assignment: assigned
Connectivity: connected
Configuration: unconfigured
ation into
OS
Assignment: assigned
Connectivity: connected
Configuration: configured
Содержание SPARC Enterprise M4000
Страница 1: ...Dynamic Reconfiguration DR User s Guide SPARC Enterprise M4000 M5000 M8000 M9000 Servers English ...
Страница 2: ......
Страница 6: ......
Страница 23: ...Preface xxi Reader s Comment Form ...
Страница 90: ...3 28 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 116: ...4 26 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 152: ...A 36 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 158: ...Glossary 4 SPARC Enterprise Mx000 Servers Dynamic Reconfiguration User s Guide September 2007 ...
Страница 161: ......