Preparation for use and operation
Producing readiness for operation
10
A26391-K82-Z110-1-7619
•
For wireless data transfer you must align the workstation's IrDA interface with that of the
partner device (e. g. PC). The devices must not be more than one meter apart.
Producing readiness for operation
!
The power cord supplied conforms to the requirements of the country in which you
purchased your workstation. Make sure that the power cable is approved for use in the
country in which you intend to use it.
The workstation and the power adapter should be at least 200 mm apart. Keep other
objects 100 mm clear of the workstation and its power adapter.
Do not cover the ventilation slots in the workstation and the power adapter.
Ê
Place the workstation on a flat, sturdy surface.
1
2
3
Ê
Plug the DC output connector on the power adapter into the DC input connector (DC IN) on the
workstation (1).
Ê
Connect the power cable to the power adapter (2).
Ê
Plug the power cable into the power outlet (3).
i
You can also make your workstation operational by connecting it to the optional car
adapter (see "
Charging, caring for and maintaining the workstation battery
Содержание CELSIUS MOBILE 810
Страница 3: ......
Страница 9: ...Contents A26391 K82 Z110 1 7619 Port for external monitor 63 Parallel port 63 Index 65...
Страница 50: ......
Страница 60: ......