![Fujitec MO-1330 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/fujitec/mo-1330/mo-1330_instruction-manual_2343749013.webp)
3 Motion Timing Chart
①Changing torque after the output of fastening complete signal.
②Changing torque while screwdriver is rotating
4 Note
Torque changing input terminal (3P Nylon Connector ) should be used as "Common" and "2" or "3"
should be connect as "Torque 1" or "Torque 2" without fail. Please input the shart signal of the
screwdriver after the connection.
Without connection with 2 or 3, input of start signal may damage motor.
10.Service
①Requesting repair service
Before requesting repair service, check the unit again in accordance with "Torubleshooting"on page 8.
If the trouble can not be solved with measures given on page 8, please consult with your dealer.
②After sales service
If you have any questions, please make inquiries to your dealer.
Please inquire an uncertain point of the shop.
5P Metal Outlet 1-5
3P Nylon Connector
5P Metal Outlet 2-3
5P Mtal Outlet 2-4
Start signal
Screwdriver
Changing Torque
Complete signal
( contact A )
Complete signal
( contact B )
Torque 1 (1-2)
Torque 2 (1-3)
Start signal
Screwdriver
Changing Torque
Complete signal
( contact A )
Complete signal
( contact B )
5P Metal Outlet 1-5
3P Nylon Connector
5P Metal Outlet 2-3
5P Mtal Outlet 2-4
-12-