PRODUCTION AND QUALITY CONTROL
21
Quality Control (Q.C.) procedures are of utmost importance in manufacturing operations. Following the
procedures will assure the quality of urethane foam in the product. The procedures are as follows:
1. SLUG PRO START-UP PROCEDURE
2. RATIO PROCEDURE
3. THROUGHPUT PROCEDURE
4. REACTION PROFILE
a) String-Gel
b) Tack-Free
c) Density
5. SHOT TIME PROCEDURE
6. SHUT DOWN PROCEDURE
The following items are needed:
• Stopwatch
• Gram scale
• 30-gallon plastic bags
• Thin wire (e.g. coat hanger)
• Calculator
www.foamsupplies.com
|
www.ecomatetechnology.com
|
1.800.325.4875
Содержание PROFESSIONAL Series
Страница 2: ...www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 7: ...PROCESS DESCRIPTION ...
Страница 10: ...5 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 11: ...EQUIPMENT DESCRIPTION ...
Страница 15: ...EQUIPMENT DESCRIPTION 10 STANDARD UNIT www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 16: ...11 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 17: ...CHEMICAL PREPARATION STORAGE HANDLING ...
Страница 21: ...INSTALLATION ASSEMBLY ...
Страница 24: ...19 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 25: ...PRODUCTION AND QUALITY CONTROL ...
Страница 32: ...27 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 34: ...29 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 35: ...CHANGING CHEMICAL CYLINDERS ...
Страница 40: ...35 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 41: ...MAINTENANCE ...
Страница 49: ...TROUBLESHOOTING ...
Страница 57: ...SAFETY HANDLING ...
Страница 62: ...57 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 63: ...EQUIPMENT DRAWINGS PARTS ...
Страница 64: ...59 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...