INSTALLATION AND ASSEMBLY
18
HEATING UNIT CONNECTION
1. Attach heat cables or heat switch cord amphenols into the heating device (typically a HB-01
or HB-02W unit).
2. Make sure the temperatures on the read out reach the set points.
TIMING UNIT CONNECTION
1. Connect gun switch cord to 3-prong amphenol.
2. Connect air solenoid switch cord to 2-prong amphenol.
3. Plug timer into 110-volt outlet.
NOTE: Timers are precision instruments and extreme care should be taken to prevent abuse.
TIMER TEST PROCEDURE
This is the point to test the operation of the timer without dispensing chemical.
1. Turn Timer Power Switch to the ON position.
2. Set timer to AUTO position.
3. Set timer for 10 seconds.
4. Make sure that the Slide Safety Valve is in the OFF (or back) position and that all SLUG PRO gun ball
valves are in the closed position.
5. For DT Timer, press trigger button once. At this point the timer should start and stop counting after
10 seconds. If not, the timer and/or connections are not functioning properly.
For MT Timer, press trigger button once. Pre-set shot time will be displayed. Press trigger button
a second time to begin shot sequence.
6. Press trigger again, but before the timer counts down 10 seconds, press the trigger again to stop the
count. If the count does not stop, the timer and/or connections are not functioning properly.
THE FSI FOAM UNIT IS NOW READY FOR TEST AND OPERATION!
www.foamsupplies.com
|
www.ecomatetechnology.com
|
1.800.325.4875
Содержание PROFESSIONAL Series
Страница 2: ...www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 7: ...PROCESS DESCRIPTION ...
Страница 10: ...5 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 11: ...EQUIPMENT DESCRIPTION ...
Страница 15: ...EQUIPMENT DESCRIPTION 10 STANDARD UNIT www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 16: ...11 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 17: ...CHEMICAL PREPARATION STORAGE HANDLING ...
Страница 21: ...INSTALLATION ASSEMBLY ...
Страница 24: ...19 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 25: ...PRODUCTION AND QUALITY CONTROL ...
Страница 32: ...27 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 34: ...29 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 35: ...CHANGING CHEMICAL CYLINDERS ...
Страница 40: ...35 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 41: ...MAINTENANCE ...
Страница 49: ...TROUBLESHOOTING ...
Страница 57: ...SAFETY HANDLING ...
Страница 62: ...57 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Страница 63: ...EQUIPMENT DRAWINGS PARTS ...
Страница 64: ...59 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...