![Frymaster OCF30 Series Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/frymaster/ocf30-series/ocf30-series_service-and-parts-manual_2340560032.webp)
1-26
If 24 VAC is present across gas valve main coil, check the incoming gas pressure and compare to the
tables on page 2-4 of the Installation and Operation manual.
1.
If incoming gas pressure
is not
correct, the probable cause is a problem with the gas supply to fryer.
2.
If incoming gas pressure
is
correct, check the burner manifold gas pressure and compare it to the
tables on page 2-7 of the Installation and Operation manual.
a.
If burner manifold gas pressure
is
not
correct, the probable cause is an improperly adjusted or
failed gas valve. Adjust the valve by following the procedure “Check Burner Manifold Pressure”
in Section 1.7 of this manual. If the valve cannot be adjusted, replace it.
b. If outgoing gas pressure
is
correct, the gas valve is okay.
1.11.3 Troubleshooting the Temperature Probe
CAUTION
Disconnect the 3000 controller before testing temperature probe resistances to avoid
invalid readings
Prior to checking for problems associated with the temperature probe, inspect the probe body for damage
while it is still in the frypot. Remove and replace the probe if it is bent, dented, or cracked. Also, inspect leads
for fraying, burning, breaks, and/or kinks. If found, replace the probe.
The following processes will assist you in troubleshooting the temperature probe and ruling it out as a
probable cause:
Before testing the probe, determine the temperature of the cooking oil using another thermometer or
pyrometer placed at the tip of the questionable probe.
If resistance through J3 pins 2 and 6 (J1 pins 2 and 6 for left side of dual unit) is not approximately
equal to that given in the Probe Resistance Chart for the corresponding temperature, the probe has
failed and must be replaced.
If resistance through J3 pins 2 and 6 (J1 pins 2 and 6 for left side of dual unit) is approximately
equal to that given in the Probe Resistance Chart for the corresponding temperature, measure the
resistance through each of the previously tested pins to ground.
1.
If resistance
is not
5 mega-Ohms or greater in each pin, the probe has failed and must be replaced.
2.
If resistance
is
5 mega-Ohms or greater in each pin, the probe is okay.
1.11.4 Replacing the Transformer, Reset Switch or Filter Relay
Disconnect the fryer from the electrical power supply. Remove the cover from the transformer box in the rear
of the fryer to expose the interior of the transformer box. Replace the transformer or filter relay marking the
wires to ease reassembly. Once replaced, reconnect the power. When replacing a filter relay in the
transformer, ensure the 24VAC relay (8070012) is used.
Содержание OCF30 Series
Страница 9: ...1 3...
Страница 46: ...1 40 1 16 Principal Wiring Connections...
Страница 47: ...1 41 1 17 Wiring Diagrams 1 17 1 FPGL230 430 Wiring 120V CE and Export...
Страница 48: ...1 42 1 17 1 2 FPGL230 430 Wiring 250V Australia...
Страница 49: ...1 43 1 17 2 FPGL330 Wiring 120V CE and Export...
Страница 50: ...1 44 1 17 2 2 FPGL330 Wiring 250V Australia...
Страница 51: ...1 45 1 17 3 FPGL430 Extra Transformer Box Wiring...
Страница 52: ...1 46 1 17 4 Modular Basket Lift 100 120V...
Страница 53: ...1 47 1 17 5 Modular Basket Lift 208 250V...
Страница 54: ...1 48 1 17 6 Basket Lift Interface Harness...
Страница 55: ...1 49 1 18 Simplified Wiring Diagrams 1 18 1 FPGL30 Series Full Vat with Dual Spark Module...
Страница 56: ...1 50 1 18 2 FPGL30 Series Full Vat Single Spark Module excluding Australia...
Страница 58: ...1 52 1 18 4 FPGL30 Series Simplified Wiring with 3000 Controller...
Страница 59: ...1 53 1 18 5 FPGL30 Series Data Network Flowchart...
Страница 60: ...1 54 1 18 6 Shortening Melting Unit Wiring Diagram prior to Mar 2012...
Страница 61: ...1 55 1 18 6 2 Shortening Melting Unit Wiring Diagram after Mar 2012...
Страница 62: ...1 56 1 18 7 Bulk Oil Wiring 1 18 7 1 FPGL230 430 Wiring 120V CE and Export Bulk Oil...
Страница 63: ...1 57 1 18 7 2 FPGL230 430 Wiring 250V Australia Bulk Oil...
Страница 64: ...1 58 1 18 7 3 FPGL330 Wiring 120V CE and Export Bulk Oil...
Страница 65: ...1 59 1 18 7 4 FPGL330 Wiring 250V Australia Bulk Oil...
Страница 66: ...1 60 1 18 8 Bulk Oil Box Wiring...
Страница 67: ...1 61 1 19 Capable Controls Ignition Module Wiring Diagrams...
Страница 69: ...2 2 2 2 Basket Lift Assy and Associated Parts...
Страница 73: ...2 6 2 4 2 Drain Tube Sections and Associated Parts See Section 2 4 1 for Drain Valves...
Страница 75: ...2 8 2 5 2 Component Boxes...