1-15
Disassembling A Frypot
(Full Vat Illustrated)
Spacer
s
Spacer
10
2
3
4
5
6
7
8
1
11
9
See page 1-17 for reassembly illustration.
11.
Remove the upper burner rails (11).
NOTE:
For the following steps, refer to the frypot exploded view on page 1-
16 for component identification.
12.
Remove any residual insulation, sealant, and/or oil from the exterior of the frypot.
13.
Place the “L” shaped pieces of the combustion chamber insulation (1) in the front and rear corners of both upper
rail-retaining slots. (See page 1-17).
14.
Using a mallet and short piece of wood, tap the corner tabs of the combustion chamber over the insulation to
ensure a solid seal of the burner.
15.
Install the upper burner rails (2) with the heat deflectors slanting toward the rear of the frypot. The rails will
cover the “L” shaped pieces of combustion chamber insulation previously installed.
16.
Place the upper inner combustion chamber insulation and insulation retainers (3) on the top two studs on each side
of the front of the frypot and secure with ¼”-20 washer-nuts.
It is normal for the retainers to slice off the
overhanging insulation.
17.
Place the lower rear combustion chamber insulation (4) on the lower four studs at the rear of the frypot.
18.
Place one 1.625-inch tubular spacer (5) on each of the flue assembly (upper) studs at the rear of the frypot.
NOTE:
There are three different sizes of spacers. Verify the size to ensure the correct spacers are installed.
19.
Press the flue assembly (6) over the burner rails. It may be necessary to use a rubber mallet or screwdriver to
align the components. Use four ¼”-20 washer nuts to secure the flue assembly.
Do not tighten the retainer
nuts at this point. They should be finger-tight only.
NOTE:
The flue edge will cover one to two inches of the
lower insulation.
20.
Install the lower rear combustion chamber back(s) and retainer(s) (7) with the flanged edge(s) against the flue.
Secure with ¼”-20 washer nuts.
NOTE:
Full-vat units have two-piece backs and four retainers. Dual-vat units
come with one-piece backs and only two retainers.
Содержание OCF30 Series
Страница 9: ...1 3...
Страница 46: ...1 40 1 16 Principal Wiring Connections...
Страница 47: ...1 41 1 17 Wiring Diagrams 1 17 1 FPGL230 430 Wiring 120V CE and Export...
Страница 48: ...1 42 1 17 1 2 FPGL230 430 Wiring 250V Australia...
Страница 49: ...1 43 1 17 2 FPGL330 Wiring 120V CE and Export...
Страница 50: ...1 44 1 17 2 2 FPGL330 Wiring 250V Australia...
Страница 51: ...1 45 1 17 3 FPGL430 Extra Transformer Box Wiring...
Страница 52: ...1 46 1 17 4 Modular Basket Lift 100 120V...
Страница 53: ...1 47 1 17 5 Modular Basket Lift 208 250V...
Страница 54: ...1 48 1 17 6 Basket Lift Interface Harness...
Страница 55: ...1 49 1 18 Simplified Wiring Diagrams 1 18 1 FPGL30 Series Full Vat with Dual Spark Module...
Страница 56: ...1 50 1 18 2 FPGL30 Series Full Vat Single Spark Module excluding Australia...
Страница 58: ...1 52 1 18 4 FPGL30 Series Simplified Wiring with 3000 Controller...
Страница 59: ...1 53 1 18 5 FPGL30 Series Data Network Flowchart...
Страница 60: ...1 54 1 18 6 Shortening Melting Unit Wiring Diagram prior to Mar 2012...
Страница 61: ...1 55 1 18 6 2 Shortening Melting Unit Wiring Diagram after Mar 2012...
Страница 62: ...1 56 1 18 7 Bulk Oil Wiring 1 18 7 1 FPGL230 430 Wiring 120V CE and Export Bulk Oil...
Страница 63: ...1 57 1 18 7 2 FPGL230 430 Wiring 250V Australia Bulk Oil...
Страница 64: ...1 58 1 18 7 3 FPGL330 Wiring 120V CE and Export Bulk Oil...
Страница 65: ...1 59 1 18 7 4 FPGL330 Wiring 250V Australia Bulk Oil...
Страница 66: ...1 60 1 18 8 Bulk Oil Box Wiring...
Страница 67: ...1 61 1 19 Capable Controls Ignition Module Wiring Diagrams...
Страница 69: ...2 2 2 2 Basket Lift Assy and Associated Parts...
Страница 73: ...2 6 2 4 2 Drain Tube Sections and Associated Parts See Section 2 4 1 for Drain Valves...
Страница 75: ...2 8 2 5 2 Component Boxes...