1-10
Blower Housing
Blower Wheel
Wrap the motor and wires
with plastic wrap or a
plastic bag.
4.
Remove the plastic wrap from the blower motor assembly. Reassemble the blower motor assembly and blower
housing. Reinstall the blower shield.
5.
Reinstall the blower assembly in the fryer and reconnect the wiring disconnected in Step 1.
6.
Light the fryer in accordance with the procedure described in Chapter 3, Section 3.2.2 of the OCF30™ Series Gas
Fryer Installation and Operation Manual (P/N 819-6687).
7.
After the burners have been lit for at least 90 seconds, observe the flames through the burner viewing ports
located on each side of the combustion air blower.
The air/gas mixture is properly adjusted when the burner manifold pressure is in accordance with the applicable
table on page 1-6 and the burners display a bright orange-red glow. If a blue flame is observed or if there are dark
spots on a burner face, the air/gas mixture requires adjustment.
NOTE: Opening the air shutter too much may
result in whistling. It should not be more than 1/3 open.
1.9.7 Adjusting the Air/Gas Mixture
On the side of the blower housing opposite the motor is a shutter plate with a locking nut. Loosen the nut enough to
allow the shutter to be moved, then adjust the position of the shutter to open or close the air intake opening until a
bright orange-red glow is obtained. Carefully hold the shutter in position and tighten the locking nut (see illustration
on the following page).
Right
Viewing Port is
behind motor.
Left Viewing
Port.
Содержание OCF30 Series
Страница 9: ...1 3...
Страница 46: ...1 40 1 16 Principal Wiring Connections...
Страница 47: ...1 41 1 17 Wiring Diagrams 1 17 1 FPGL230 430 Wiring 120V CE and Export...
Страница 48: ...1 42 1 17 1 2 FPGL230 430 Wiring 250V Australia...
Страница 49: ...1 43 1 17 2 FPGL330 Wiring 120V CE and Export...
Страница 50: ...1 44 1 17 2 2 FPGL330 Wiring 250V Australia...
Страница 51: ...1 45 1 17 3 FPGL430 Extra Transformer Box Wiring...
Страница 52: ...1 46 1 17 4 Modular Basket Lift 100 120V...
Страница 53: ...1 47 1 17 5 Modular Basket Lift 208 250V...
Страница 54: ...1 48 1 17 6 Basket Lift Interface Harness...
Страница 55: ...1 49 1 18 Simplified Wiring Diagrams 1 18 1 FPGL30 Series Full Vat with Dual Spark Module...
Страница 56: ...1 50 1 18 2 FPGL30 Series Full Vat Single Spark Module excluding Australia...
Страница 58: ...1 52 1 18 4 FPGL30 Series Simplified Wiring with 3000 Controller...
Страница 59: ...1 53 1 18 5 FPGL30 Series Data Network Flowchart...
Страница 60: ...1 54 1 18 6 Shortening Melting Unit Wiring Diagram prior to Mar 2012...
Страница 61: ...1 55 1 18 6 2 Shortening Melting Unit Wiring Diagram after Mar 2012...
Страница 62: ...1 56 1 18 7 Bulk Oil Wiring 1 18 7 1 FPGL230 430 Wiring 120V CE and Export Bulk Oil...
Страница 63: ...1 57 1 18 7 2 FPGL230 430 Wiring 250V Australia Bulk Oil...
Страница 64: ...1 58 1 18 7 3 FPGL330 Wiring 120V CE and Export Bulk Oil...
Страница 65: ...1 59 1 18 7 4 FPGL330 Wiring 250V Australia Bulk Oil...
Страница 66: ...1 60 1 18 8 Bulk Oil Box Wiring...
Страница 67: ...1 61 1 19 Capable Controls Ignition Module Wiring Diagrams...
Страница 69: ...2 2 2 2 Basket Lift Assy and Associated Parts...
Страница 73: ...2 6 2 4 2 Drain Tube Sections and Associated Parts See Section 2 4 1 for Drain Valves...
Страница 75: ...2 8 2 5 2 Component Boxes...