HYBRID
P
AC nom
=
5 kW
P
AC nom
=
7 kW
P
AC nom
>
P
AC nom
(inverter 1) > P
AC nom
(hybrid)
Example: 7 kW > 5 kW
Two Smart Meters are required for the
inverters. These must be installed at the
feed-in point.
Hybrid system overview (web page):
Settings – System overview: Meter must
be configured at the feed-in point
Datamanager overview (web page):
Settings – System overview: Meter must
be configured at the feed-in point
Settings – PSC editor:
Dynamic power reduction
Power limit: Limit for the entire system
Total DC system output: 12,000 Wp
Max. grid power feed: 60%
117
EN
Содержание Symo Hybrid 3.0-3-S
Страница 2: ......
Страница 10: ...10 ...
Страница 11: ...General information 11 ...
Страница 12: ...12 ...
Страница 16: ...16 ...
Страница 34: ...34 ...
Страница 35: ...Operation 35 ...
Страница 36: ...36 ...
Страница 66: ...66 ...
Страница 67: ...Fronius system monitoring 67 ...
Страница 68: ...68 ...
Страница 80: ...80 ...
Страница 81: ...Current data services and settings offered by Fronius system monitor ing 81 ...
Страница 82: ...82 ...
Страница 119: ...Troubleshooting and maintenance 119 ...
Страница 120: ...120 ...
Страница 133: ...Appendix 133 ...
Страница 134: ...134 ...