Boiler Maintenance
Cleaning and Maintenance
page 16
a
B 034 00 04
a
4
4.1.1
Maintenance schedule for Turbomat 320
T(D) = Daily, W = Weekly, M = Monthly, VJ(3-M) = Every 3 months , HJ(6-M) = Every six months, J(Y) = Annually
No.
Component / Maintenance Operation
Interval
1
C heat exchanger
2
Induced draught fan + flue gas return (FGR)
3
Combustion air blower fan
Overall visual inspection
Clean all components where necessary
Change defective components immediately.
D
4
Gear motors
Check all gear motors for oil leaks.
5
Heat-exchanger ash removal
6
Ash removal chamber
Check the ash level.
Empty the ashcan where necessary.
See page 23, Emptying theash can
W