General Information
Design Information
Fr
öling
Boiler and Container Making GmbH, Industriestra
ße 12, A
-4710 Grieskirchen
page 7
Tel. +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 [email protected]
www.froeling.com
Edition: 02.06.2005
2
2.2
Design information
As a rule, the operator is not authorized to modify or disable the safety equipment.
In addition to the operating instructions and the applicable regulations for the country in which
the boiler will be operated, all fire, police, and electrical regulations must be observed.
2.2.1
Official approval and reporting obligations
NOTE
Each heating system must be officially approved.
In Austria:
- New installations must be reported to the local building or police authorities.
In Germany:
- Report new installations to an approved chimney sweep and to the building authorities.
2.2.2
Domestic hot water requirements
There are no special requirements for domestic hot water supplies.
Applicable standards:
Austria:
ÖNORM H 5195, ÖNORM H 5195
-2
Germany:
VDI 2035
If the system is topped up or refilled:
Prepare (soften) the water to prevent boiler scaling.