Assembly | 6
M2250322_en | Installation instructions Wood chip boiler T4e 200-350
51
r
Put on the heat exchanger cover and attach using star-shaped screws
r
Put on the insulating cover and thermal insulation
Ä
T4e 200-250: two insulated covers
Ä
T4e 300-350: three insulated covers
r
Slide the floor insulation underneath the boiler from the front and back as shown
r
Slide the ash container onto the ash duct and secure with the locking lever (A)
r
Slide the key plate (B) into the safety limit switch and close both insulated doors
The safety limit switch can be adapted to the ash container as necessary: