5 | Transport and storage
30
M2250322_en | Installation instructions Wood chip boiler T4e 200-350
5.3 Positioning
NOTICE
Damage to components if handled incorrectly
r
Follow the transport instructions on the packaging
r
Transport components with care to avoid damage
r
Protect the packaging against damp conditions
r
Pay attention to the pallet's centre of gravity when lifting
r
Position a forklift or similar lifting device at the boiler base and bring in the
components
Ä
T4e 200-250:
Min. fork length 1,500 mm, min. load capacity 2,500 kg
Ä
T4e 300-350:
Min. fork length 1,500 mm, min. load capacity 3,000 kg
If you need to dismantle the boiler to bring it in:
r
Remove cardboard and transport frame
"Remove cardboard and transport frame" [
r
Dismantle the components of the boiler until it can be brought in
"Dismantling for location where positioning is difficult" [
Positioning using a crane:
r
Remove the insulating cover and thermal insulation
Ä
T4e 200-250: two insulated covers
Ä
T4e 300-350: three insulated covers
r
Loosen the screw connection on the front heat exchanger cover and open the cover
Ä
Use the spanner provided