6 Decommissioning
6.1 Mothballing
The following measures should be taken if the boiler is to remain out of service for
several weeks (e.g. during the summer):
❒ Clean the boiler thoroughly and close the doors fully
If the boiler is to remain out of service during the winter:
❒ Have the system completely drained by a qualified technician
➥ Protection against frost
6.2 Disassembly
To disassemble the system, follow the steps for assembly in reverse order.
6.3 Disposal
❒ Ensure that the system is disposed of in an environmentally friendly way in ac‐
cordance with waste management regulations.
❒ You can separate and clean recyclable materials and send them to a recycling
centre.
❒ The combustion chamber must be disposed of as builders' waste.
6
Decommissioning
Mothballing
68
Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at
All manuals and user guides at all-guides.com